Monday, October 09, 2006

Been doing some painting.

No photos yet. And they may not come for awhile. Didn't realize how long it's going to take to paint my house:
1. First got to gap fill all the holes.
2. Wait to dry.
3. Sand.
4. Then sugar soap.
5. Wait to dry.
6. Then prime (since all the doors, frames and skirting boards are unpainted).
7. Wait to dry.
8. Then paint with semigloss paint.
**Careful not to drip on wood floors or walk in paint.**
9. Wait to dry again.
**Sit down to rest and watch Bathurst 1000.**
10. Then paint second coat of semigloss paint.
11. Then begin to cut in and paint walls.
12. Wait for wall to dry.
13. Paint second coat.
BEAUTIFUL JOB WELL DONE!
(and that is only for the entrance way!)

See what I mean??

That's about all that we've been up. Or I should say I've been up to. Colin's been busy digging holes, moving sprinklers, cleaning sheds, and everything else around the house. I tried to do some gardening yesturday. Got a bit of a jungle going on. Stepped on sprinkler. Oops. Colin was able to fix it. Then stepped on it again and this time broke it. Colin's a little annoyed. Told me to stop gardening. Go inside and paint. So I did. Haven't got to step 10 yet. Maybe next weekend.

1 comment:

Anonymous said...

Are you sure it takes all those steps to paint. I remember when we first had our house painted on the Island and you and Michael decorated over it with your crayons - behind the chesterfield. Red crayon at that!What a pair....Hope your day is going very well. Love you, my dear. Mom